Caviar Farm Cash Flow and Break-Even: A Worked Example
See how survival, later harvest, sale price and feed costs affect a farm model.
Updated
Start with saleable production
Saleable caviar (kg) = fish stocked × cumulative survival to harvest × female share among survivors × share of females ready that year × average saleable kilograms per harvested female. If starting from fish weight, model roe recovery and processing loss separately.
In an illustrative cohort of 1,000 fish with 70% survival, 50% females, 80% ready for harvest and 0.6 kg of saleable caviar per harvested female, output is 168 kg. At 60% survival and otherwise unchanged assumptions, output falls to 144 kg. These are demonstration numbers, not farm data or species benchmarks.
Break-even price and payback
Net present value is the sum of discounted annual cash flows. To estimate a break-even price, subtract the present value of by-product revenue from the present value of applicable costs, then divide by the sum of discounted saleable kilograms. Include construction, equipment, juveniles, feed, utilities, oxygen, labour, testing, slaughter, packaging, chilled distribution and sales. Include meat revenue only where sales are plausible. Use a discount rate consistent with the project or equity cash-flow method to avoid double-counting financing costs.
| Change | Illustrative result |
|---|---|
| Survival falls from 70% to 60% | 168 kg becomes 144 kg, a reduction of about 14.3%. |
| Revenue arrives one year later at a 15% discount rate | Present value falls by 13.0% before extra operating costs. |
| Year 6 versus year 10 at the same 15% discount rate | Year 10 requires about 1.75 times the nominal proceeds for equal present value before cost and risk differences. |
| Feed prices rise by 30% | Multiply feed costs by 1.30. The effect on profit depends on feed’s cost share and the timing of purchases. |
Inputs for a farm plan in Iran
Record location, water supply and seasonal tests, permits, system, backup oxygen and power, juvenile age and price, survival and yield by species, net prices for caviar and meat, labour, logistics and payment terms. Use rial or toman consistently, date each quote, and align inflation assumptions with the discount rate. Check the lowest cash balance during the project and the delay between harvest and collection.